top of page

OUR STAGED SYSTEM OF DESIGN & OPTIMIZATION
LESS RISK, FAST DEVELOPMENT & MORE FLEXIBILITY

High salinity, high fouling and high scaling process and wastewaters are unique in composition and nature, challenging conventional treatment technologies but ideal for industrial forward osmosis (FO). Meeting client needs is not a strategy of hope but one of collaboration and good engineering and why FWTC has developed their unique 4-Stage Design Process to ensure success with every project. From modelling to on-site piloting, get your project started today with a free Stage 1 modelling assessment from our team of experienced and skilled engineers.

STAGE 1

thumbnail_Staged icons_Stage_1.png

Computer Modelling

Go / No Go

  • Predictive operations and system performance modelled

  • Solubilities, complexes and precipitates are calculated and qualified

________________________________________________________________________________________________________________________________

STAGE 2

thumbnail_Staged icons_Stage_1.png

Bench Top Testing

Initial System Modelling

  • FO membrane and salt draw testing on representative sample

  • Test results provide data on key operating parameters

________________________________________________________________________________________________________________________________

STAGE 3

thumbnail_Staged icons_Stage_1.png

In-House Pilot Testing

Test and Design Validation

  • Scaled, fully operational pilot plant

  • Data from Stage 1-3, optimization of system performance

________________________________________________________________________________________________________________________________

STAGE 4

thumbnail_Staged icons_Stage_1.png

On-Site Demonstration Plant

System Performance Validation

  • Scaled, fully operational pilot plant

  • Data from Stage 1-3, optimization of system performance

bottom of page